Location
Dammam, KSA, Al-Rawdah District
Area
92 sqm
Type
Women's Fitness Center / مركز لياقة نسائي
Duration
2 DAYS
A women's fitness center in Dammam was about to open, but their reception area had an old, ugly concrete floor. The gym had a beautiful modern design with high ceilings and big windows. Standard tiles with grout lines wouldn't look good here. The client wanted a seamless microcement flooring finish applied directly over the old concrete. The biggest problem? We only had exactly two days to finish everything before the grand opening. Also, the large windows let in a lot of afternoon sun, so the floor needed strong UV protection to stop the color from fading over time.
To finish in just two days, we had to work fast and smart. First, we carefully covered the built-in reception desk and walls with plastic sheets to protect them. Then, we ground the old concrete floor to open up the surface, which helps the new microcement flooring stick perfectly. We applied the base coats quickly. By the second day, we were ready for the final step: putting on a strong, UV-stable sealer. When we rolled it on, you could clearly see the wet sealer soaking deep into the dry floor, giving it the ultimate protection it needs to handle heavy gym use.
We finished the whole 92-square-meter floor right on time, hitting that strict two-day deadline. The old concrete is completely gone. Now, the entrance has a stunning, seamless microcement flooring that matches the gym's modern industrial look perfectly. It's been three months since the gym opened. Even with gym bags dragged around and heavy daily foot traffic, the floor still looks brand new. Thanks to the UV-stable sealer, the dark charcoal color hasn't faded at all under the hot afternoon sun.
3 photos



Completed
June 2026
“Honestly, when they said they’d finish the whole reception floor in two days right before our opening, I didn't believe it. But they actually delivered. The charcoal shade matches the rest of our interior perfectly, and the floor looks incredible when the afternoon sun hits it. We've been dragging heavy gym bags over it for three months now and it hasn't scratched at all. Super clean work around our main desk too.”