Loading

Location
Riyadh, Saudi Arabia, Riyadh City
Area
185 sqm
Type
Corporate Office / مكتب تجاري
Duration
4 DAYS
The management of this premium corporate office in Riyadh was facing a major maintenance issue with their existing floor covering. The entire office layout, including the reception area, pantry, staff corridors, and a large multi-purpose conference room—which remains heavily packed with shifting corporate chairs—was originally covered with traditional commercial tiles. Over years of intense daily operations, the heavy friction from sliding chairs and high foot traffic from employees caused the tile grout lines to crack, erode, and absorb deep-seated dark dirt. Many tile edges had chipped, creating an uneven look that ruined the company's professional aesthetic and caused annoying noise during meetings. The client needed a premium, heavy-duty architectural floor that would eliminate joints completely, resist constant furniture movement, and be installed quickly without extending office downtime.
To complete this 185-square-meter office upgrade flawlessly, our team executed a highly coordinated four-day application process over the old tile substrate. On the first day, we heavily grinded the tile surface using specialized diamond equipment to open up the pores and ensure a rough, clean bond. After extracting all micro-dust, we applied a high-penetration structural primer to secure the base. To completely prevent any future reflective cracking from the old tile joints underneath, we embedded a high-strength fiberglass reinforcement mesh directly into the first polymer-modified base coats. Over the second and third days, our technicians hand-troweled sequential layers of premium architectural microcement to build a perfectly flat, continuous matrix. On the fourth day, after total curing, we sealed the entire 185 sqm surface with multiple coats of an advanced commercial polyurethane sealer to ensure maximum resistance against scratches, stains, and daily office cleaning.
The final outcome is a stunning, completely seamless corporate environment spanning the entire 185 square meters of the workplace. By replacing the old tiled layout with an advanced seamless microcement system, we successfully permanently eliminated thousands of linear meters of dirty grout joints. The large conference room, despite its intensive chair layout, now features a sleek, impact-absorbent floor where high-end office furniture slides smoothly without causing sound or scratch damage. The continuous surface delivers a pristine, ultra-modern corporate identity that is incredibly easy to maintain and clean. Despite the challenges of preparing directly over an old tile floor, the hand-crafted finish was delivered perfectly within the strict four-day deadline, providing the client with exceptional structural durability and a premium modern look.
4 photos




Completed
August 2024
“We had a serious issue with our old tiled floors due to the constant dragging of training chairs, but this seamless application solved everything. The execution was fast, professional, and took only 4 days. The surface is incredibly tough and highly practical for daily maintenance.”